Partial answers are fine — capture what's known and fill gaps on a call or site visit. Send controlled data only through approved export-control channels.
01
0/11Current Accel-RF BI Stands
8 total: 7 HPA, 1 driver amp · 16 DUTs each
02
0/6In-House LN2 BI Stands
2 total · 4 DUTs each
03
0/7Requirements for the New Systems
Multizone BI — Delta V chamber, Despatch RBC, in-between, or standard stand
04
0/6ESS Lab Facility
Lower ceilings — smaller form factor preferred
05
0/3Data and IT
06
0/4Program and Schedule
BAE Systems
- Harold Andrews — Eng Prin – Test, Electronic Combat Solutionsharold.andrews@baesystems.us
- Kevin Veilleux — BAE Systemskevin.veilleux@baesystems.us
- Brandon Pritchard — BAE Systemsbrandon.pritchard@baesystems.us
- Sergio Rivera — BAE Systemssergio.rivera@baesystems.us
Delta V Instruments
- Chad Storey — Point of contact — bid phasechad@delta-v.com
- Rob Caldwell — Delta V Instrumentsrob@delta-v.com
- Bob Storey — Delta V Instrumentsbob@delta-v.com
- Randy Williams — Delta V Instrumentsrandy@delta-v.com